Name : Chepe A Hydropower Project (7 MW)


A. PROGRESS

  • Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA) is signed.
  • Initial Environmental Examination (IEE) is approved
  • Land acquisition completed
  • Detail Design Completed
  • Infrastructure development such as access road, camp house under process
  • contractor selected for Civil, HM & EM works
  • Financial closure with Rastriya Banijya Bank and Nepal Bank Ltd.

B. PROJECT FEATURES
1. Project Details

Development Region Western Development Region
District Gorkha and Lamjung District
Water Source Chepe Khola
Type of Scheme RoR
Access Road Dumre-Paluntar (22 km black topped)
Earthen - Borangkhola to Kuyele
Gross Head 91 m
Design Discharge 10.0 m3/s
Install Capacity 7 MW
Annual Energy 39.3 GWh (Dry-11.8, Wet–27.5)

2. Hydrology

River Chepe Khola
Catchment Area at Intake 189.64 km2
Design flood at Intake (100 years) 674 m3/s
Environmental Flow 0.303 m3/s

3. Headworks

Diversion structure Free flow weir
Length of weir 43 m

4. Connecting Canal

Canal Type Rectangular RCC closed conduit
Length of Canal 155 m

5. Desilting Basin

Type RCC Rectangular, 4 bays
Dimension (width * height) 5 m x 5 m
Length of effective basin 45 m

6. Headrace Pipe

Conveyance Length 3250 m
Type E350BR
Diameter 2.3 m internal dia.

7. Surge Tank

Type Simple Circular
Construction Concrete lined
Diameter 10 m
Height 22.5 m

8. Penstock Pipe

Type Welded Surface/Burried Penstock
Length 420 m
Diameter 1.9 m internal dia.
Pipe Material E350BR

9. Powerhouse

Type Surface with out door substation
PH dimension (L * W) 32 m * 9 m
Height of PH building 8 m

10. Tail race

Type Rectangular
Material RCC canal
Length Main 35 m, Feeder 168.7 m

11. Turbine

Number of Units 2
Type Francis

12. Generator

Number of Units 2
Type Synchronous, 3-phase

13. Transmission

Transmission length 12 km
Capacity 33 KV
Substation Palungtar Substation
Alternate (@5 km) Chipleti, Siranchowk (most likely-under process)

14. Financial Analysis (Updated Feasibitrty study)

Project Cost with IDC (NRs) 1,320,000,000
Loan Interest Rate 11%
Internal Rate of Return 15.2%
Return on Equity 21.21%
Simple Payback Period 5.85 yrs
Discounted Payback Period 9.30 yrs
B/C ratio 1.37
Debt. Service coverage ratio 1.75
Cost per kilowatt (1 $ =NRS 115) $1623